Basic project information:
Party A: Hefei * * Photovoltaic Technology Co., Ltd
Engineering Company: Overall Subcontracting
Start time: October 10, 2023
End time: December 31, 2023
Project duration and location: 81 days/Hefei
Acceptance criteria: fluoride removal, required to be less than 1mg/l
Project effect:
Inlet water: 8mg/L
Water volume: 190m ³/h
Small scale test water: ≤ 0.1mg/L
Process and product information:
Process adopted: Fluorine containing wastewater → Primary+Secondary chemical mixing → Deep fluorine removal system
Process principle: Special defluorination composite material
Process features: Long regeneration cycle, resistant to interference from anions such as chloride ions and sulfate ions
Model: Special defluorination composite material
Dosage: 27m ³
Usage: Two in one backup
Running status:
Phase 1, 2 months: Debugging will be conducted on January 5th
Stage 2: 5 months: Stable fluoride concentration in effluent ≤ 1mg/L
Stage 3 for 9 months: Stable fluoride concentration in effluent ≤ 1mg/L