    Party A:
    Hefei * * Photovoltaic Technology Co., Ltd
    Case location:
    Project introduction:

    Basic project information:

    Party A: Hefei * * Photovoltaic Technology Co., Ltd

    Engineering Company: Overall Subcontracting

    Start time: October 10, 2023

    End time: December 31, 2023

    Project duration and location: 81 days/Hefei

    Acceptance criteria: fluoride removal, required to be less than 1mg/l


    Project effect:

    Inlet water: 8mg/L

    Water volume: 190m ³/h

    Small scale test water: ≤ 0.1mg/L


    Process and product information:

    Process adopted: Fluorine containing wastewater → Primary+Secondary chemical mixing → Deep fluorine removal system

    Process principle: Special defluorination composite material

    Process features: Long regeneration cycle, resistant to interference from anions such as chloride ions and sulfate ions

    Model: Special defluorination composite material

    Dosage: 27m ³

    Usage: Two in one backup


    Running status:

    Phase 1, 2 months: Debugging will be conducted on January 5th

    Stage 2: 5 months: Stable fluoride concentration in effluent ≤ 1mg/L